A private home owner retained ParklandGEO to conduct a slope assessment on their property for a proposed residence overlooking the Meeting Creek valley, near the village of Donalda, in Stettler County, Alberta. The proposed house site was on...
The City of Red Deer is constructing an 8 km long bypass expressway around the east side of the City. The project has been divided into multiple phases to be built over a span of twenty to thirty years. The ultimate six lane roadway will include ...
ParklandGEO undertook a comprehensive Phase 1 ESA on approximately 60 quarter sections of land that will comprise the new Northland Drive to the north and east of Red Deer. The project started in 2007 and with final report submission in 2008.
ParklandGEO has provided the materials testing and geotechnical assessments for Cells 1 through 4 at the City of Red Deer Municipal Landfill. In all, we have performed materials testing on over 30 hectares of liner and capping through the history of...
From 2006 to 2009, ParklandGEO was the geotechnical consultant for the engineering team on the City of Red Deer Storm Water and Sanitary Trunk Projects. The various component projects involved twinning of over 3000 m of storm water trunk lines between th
ParklandGEO was retained by the City of Red Deer to provide a review of the slope issues, and assess the stability of the natural slope along the Red Deer River valley, within the River View Park subdivision on the western outskirts of ...
Beginning in July 2010, ParklandGEO undertook a large scale geophysical survey and geo-hazard assessment on a proposed new residential development area in Al Ain City, in the Emirate of Abu Dhabi, UAE. Working with our geophysical consultant, we completed
In the summer and fall of 2008, ParklandGEO acted as the geotechnical consultant and provided materials engineering and testing for the site development of several CRUs in north-west Edmonton, AB. The project included...
In the winter of 2012, ParklandGEO was commissioned by Sobeys to investigate excessive settlement issues with a recently constructed parking lot in Beaumont, Alberta. The parking lot had been constructed in 2012, and due to thick peat deposits, in part..
ParklandGEO was retained by the City of Grande Prairie and two private landowners to assess the stability of a natural slope along the Bear Creek. A significant slope failure in the spring of 2007 lead to the removal of one mobile home & the potential...
In 2007, a large landslide occurred in the south hill area of Red Deer on the west bank of Piper Creek. This was a ravine slope that was subject to some industrial activity the early part of the 20th century. The top of bank and upper slope areas above...
ParklandGEO has worked closely with the Town of Three Hills throughout the life of the Three Hills Landfill to ensure the landfill meets the capacity of the neighboring communities.
ParklandGEO was retained to design, supervise the construction and monitor the performance of a methane recovery system at the Lindsay Thurber Comprehensive High School. During the construction of a building addition, an old sanitary landfill ...
In November 2008, ParklandGEO began working as a sub-consultant to ISL Engineering to help create an area structure plan for the Weberville and DMI Joint Development Areas. Key tasks in this project were to identify the possible geotechnical concerns..
ParklandGEO undertook a comprehensive Phase 1 ESA on the City of Wetaskiwin’s Main Street as part of their Street Revitalization and infrastructure upgrading program.