ParklandGEO undertook a detailed slope stability evaluation after a visual inspection found evidence of a large landslide on the east bank of the Bear Creek was causing a large storm sewer drop manhole to...
In July of 2010, ParklandGEO International undertook a large scale geophysical survey and geo-hazard assessment on a proposed new development area in Al Ain City, in the Emirate of Abu Dhabi, UAE. Working with our...
A geotechnical investigation was conducted which included the drilling of one deep borehole along the slope crest. All soil samples were returned to ParklandGEO’s Red Deer laboratory for selected testing to determine soil properties...
In September of 2012, ParklandGEO partnered with SLR Consulting (Canada) Ltd. (SLR) to conduct a Phase III Environmental Site Assessment at five former gold mine sites on the shores of Gordon Lake, NWT., about 85 km northeast of Yellowknife.
Numerous active and historical landslides have occurred within the Bear Creek corridor within the City of Grande Prairie. As part of a comprehensive assessment program, The City of Grande Prairie commissioned ParklandGEO to undertake a detailed...
In the summer and fall of 2008, ParklandGEO was commissioned to be the geotechnical consultant for the replacement of a footbridge within Pierre Grey Provincial Park, near Grande Cache, AB. The scope of work for this project included drilling 2...
In the fall of 2008, ParklandGEO was commissioned to be the geotechnical consultant for the proposed Pleasant Valley Lodge development in Athabasca, Alberta. The scope of work for this project included drilling 11 boreholes to assess the subsurface...
Since 2007, ParklandGEO acted as the geotechnical consultant and provided materials engineering and testing for the site grading at the J.V. Drivers facility in Leduc, AB. The project included underground service installation...
In the summer and fall of 2008, ParklandGEO provided materials engineering and testing for the underground service installation, grading and site paving at the Lakeview Estates Subdivision in Stony Plain...
A private home owner retained ParklandGEO to conduct a slope assessment on their property for a proposed residence overlooking the Meeting Creek valley, near the village of Donalda, in Stettler County, Alberta. The proposed house site was on...
The City of Red Deer is constructing an 8 km long bypass expressway around the east side of the City. The project has been divided into multiple phases to be built over a span of twenty to thirty years. The ultimate six lane roadway will include ...
ParklandGEO undertook a comprehensive Phase 1 ESA on approximately 60 quarter sections of land that will comprise the new Northland Drive to the north and east of Red Deer. The project started in 2007 and with final report submission in 2008.
ParklandGEO has provided the materials testing and geotechnical assessments for Cells 1 through 4 at the City of Red Deer Municipal Landfill. In all, we have performed materials testing on over 30 hectares of liner and capping through the history of...
From 2006 to 2009, ParklandGEO was the geotechnical consultant for the engineering team on the City of Red Deer Storm Water and Sanitary Trunk Projects. The various component projects involved twinning of over 3000 m of storm water trunk lines between th
ParklandGEO was retained by the City of Red Deer to provide a review of the slope issues, and assess the stability of the natural slope along the Red Deer River valley, within the River View Park subdivision on the western outskirts of ...