Project Profiles
ParklandGEO has been provided annual geotechnical services to Seven Generations Energy for their Kakwa field development since 2016. To date, this project has involved mobilization, site clearing, location and drilling of over 1180 boreholes at over 250..
Grande Prairie Regional Hospital, a major Alberta Infrastructure project located in Grande Prairie, Alberta is a multi-faceted health facility comprising of a Main Hospital and cancer centre. ParklandGEO conducted geotechnical investigations at multiple..
An active slope failure had regressed towards an occupied condominium building at 99 Street within Peace River, AB, and posed significant risk in damaging the condominium building and associated infrastructure.
The ATCO Electric EATL project is a 500 kV electric transmission line project in eastern Alberta, Canada.
In Calgary, ParklandGEO completed multiple Phase 1 ESAs on nearly 40 properties required for land acquisition or lease termination for the development and construction of the Southwest Calgary Ring Road Project (SWCRR).
Fort Hills is a green field mining oil sands project, located around 90 km north of Fort McMurray, Alberta. The project is co-owned by Suncor Energy Inc., Total E&P Canada Ltd. and Teck Resources Ltd.
The Southeast Stoney Trail (SEST) Project involved the construction of 25 kilometers of high speed, urban freeway around the southeast perimeter of the City of Calgary from Peigan Trail to Highway 22X. The Southeast Stoney Trail is a six lane divided...
The ATCO Electric EATL project is a 500 kV electric transmission line project in eastern Alberta, Canada. The entire transmission line alignment is approximately 485 km (300 miles) long, starting from an area northeast of Edmonton, near Redwater...
Significant groundwater and soil contamination, including free-phase hydrocarbons, from diesel fuel, invert, and gel-chem drilling muds were present to depths of up to 13 m below ground on a natural gas drilling lease located in northwestern Alberta.
An active slope failure had encroached on two active gas well leases at a-58-L within the Tommy Lakes Field, in the Peace River Regional District, BC, and posed significant risk in damaging the...
ParklandGEO developed a remediation plan involving an air sparging and vapour extraction system, coupled with enhanced bio-remediation in order to remediate significant hydrocarbon contamination from two different historical sources...
ParklandGEO is working on one of the largest dual-phase extraction system projects ever conducted in Canada. This project involved the delineation of a oil/natural gas condensate plume below an active battery site.
ParklandGEO has worked closely with the Mountain View Regional Waste Management Commission (MVRWMC) since the Didsbury landfill opened in 2004 to provide a profitable, flexible Class II and Class III landfill that accepts waste from several...
Slope stability and erosion problems were identified at the 20 to 26 m heigh roadway embankment site in the 1990's. The existing embankment was found to be in a state of eminent failure (FS # 1) due to the steep slopes (2H:1V) and low strength of...
ParklandGEO undertook a detailed Phase 2 Environmental Site Assessment (ESA) followed by a Remediation program at the location of a proposed new building on the Capilano Mall property in Edmonton, AB.